VIEWING SAVED RECORD - READ ONLY MODE

1. Basic Pump Information

1.9 Test Team

2. Pre-Start CHECK: All items must be validated (Status="YES") before proceeding with the test.

2.1 PUMP/MOTOR

Item DescriptionPASS CriteriaStatusRemarks

2.2 WATER LOOP

Item DescriptionPASS CriteriaStatusRemarks

2.3 TEST AUTOMATION STAND (Fixed or Portable)

Item DescriptionPASS CriteriaStatusRemarks

2.4 PRESSURE TRANSMITTERS (PTs) CHECK

Item DescriptionPASS CriteriaStatusRemarks

3. Automation & Instrument Verification

3.1 Inlet Suction Pressure Transmitter

Inlet Suction requires a Pressure Transmitter with lower range ≤ -10 PSI.
Test PointExpected ReadingActual ReadingDeviation (%)Status

3.2 Outlet Pressure Transmitter

Test PointExpected ReadingActual ReadingDeviation (%)Status

3.3 Flowmeter Configuration

3.4 Automation Stand(s) / Asset(s)

Portable Asset/Box Details

4. Test Results

4.1 Manual Mode: Quick Test

DescriptionPASS CriteriaStatusComments/Remarks

4.2 AUTO MODE: Remote Functional Test, Controlled by SCADA

DescriptionPASS CriteriaStatusComments/Remarks

4.3 Overall Test Results

PENDING

5. Asynchronous Data Integration

Drop your CSV files below. If Start/End times are defined in Section 1, the graph automatically crops to that window. If omitted, it will intelligently auto-crop to when the RPMs first engage (>100) until shutdown, and automatically populate the fields in Section 1.